niuz

Traffic on Portugal's National Road 263 near Aljustrel will be restricted from 28 September to 6 October due to paving works covering about 400 metres

1 source2 points, 0 confirmed

Points, in the order they emerged

A point is one statement a source made. It is confirmed when two or more independent sources carry it. Quotes are verbatim.

  1. Traffic on Portugal's National Road 263 near Aljustrel will be restricted from 28 September to 6 October due to paving works covering about 400 metres.

    One source
    What the source said
    SAPO Notícias
    “A circulação rodoviária na Estrada Nacional 263 (EN263), no concelho de Aljustrel, vai estar condicionada entre 28 de setembro e 6 de outubro devido à realização de trabalhos de pavimentação. A intervenção, a cargo da Infraestruturas de Portugal (IP), vai decorrer entre os quilómetros 38,251 e 38,659, abrangendo um troço com cerca de 400 metros.”

    Machine translation: Road traffic on National Road 263 (EN263), in the municipality of Aljustrel, will be conditioned between 28 September and 6 October due to paving works. The intervention, carried out by Infraestruturas de Portugal (IP), will run between kilometres 38.251 and 38.659, covering a stretch of about 400 metres.

    Read at SAPO Notícias
    Is this point wrong? Tell us
  2. Portugal's IP3 will close sections of road for traffic between 28 Sept and 1 Oct for maintenance work.

    One source
    What the source said
    SAPO Notícias
    “O IP3 vai ter cortes de trânsito em diferentes troços, entre 28 de setembro e 1 de outubro”

    Machine translation: IP3 will have traffic cuts on different sections between 28 September and 1 October

    Read at SAPO Notícias
    Is this point wrong? Tell us

Who reported it

How recent

The shading behind a date drains as it ages: full when new, three quarters at 1 hour, half at 6 hours, a quarter at 12 hours, empty after a day. The date is when the source published it.